Basic design in Oregon

Cost to Build

Cost Comparison with New Method

1260 sq ft = Total area walls + roof = 6000 sq ft of walls & roof = 180 total foam block @ 4 x 8 panels

Pour concrete slab foundation = $5000

Basic Window and Door package = $7000

28,000 board feet of 8 inch foam blocks 4 x 8 blocks @ .50/bf eps foam = $14,000

Labor- build & glue blocks, cut windows/doors

4 workers $30/hr 2 days = $2000

Labor- help electrician & plumber, lower total cost- install all switch boxes, cable, and pex piping 4 workers $30/hr = $2000

Liquid rock coating exterior = 6000 sq ft @ $2/sq ft = $12,000

Liquid rock interior coating = 6000 sq ft @ $2/sq ft = $12,000

Apply liquid rock interior 4 workers $30/hr 2 days = $2000

Apply liquid rock exterior 4 workers $30/hr 2 days = $2000

Texture synthetic stucco exterior @ $1/sq ft = $6000

4 workers $30/hr 2 days = $2000

Interior primer and paint @ $1/sq ft = $6000